Monday, 30 July 2012

Watershed+ website




The website for Watershed+ is now live! Still some tweakings and some tidying up but altogether it's ready. Aside from the background information on the programme we'll be able to anounce the developments as they happen.

Friday, 27 July 2012

Limelight compilation



After 12 cities visited by Limelight: Saturday night over the last 2 years, we thought it would be nice to see the action in the limelight in these different cities all together on a short video. Touzie Tyke edited a compilation of the 12 cities in this 14 minutes film, enjoy!

Limelight Saturday night from sans façon on Vimeo.

Monday, 9 July 2012

Hydrant fountains in action



The fountains were installed on the river front in Calgary for Canada Day last week-end, and people were trying them even before we finished installing them! And this week end the Stampede and Water Services have been working together to get them installed this morning on Stampede grounds, more pictures soon.

In the mean time here are a few pictures from last week end:

Friday, 29 June 2012

Fire Hydrant Fountains


The fabrication shop have been working hard and have been fantastic at making this project happen, they finished the three different fountains and they're almost ready to be put in place for Canada Day this week end. Here's a sneak preview of the two other designs and the first one - "strangers" or the "dating fountain" - being used this morning for a TV interview.
More pictures of them in use next week.

Tuesday, 26 June 2012

W+ residency call

We just released a call for the artist residency with Watershed+: www.watershedplus.ca/residency/res-call01.pdf Feel free to share it widely! Looking forward to reading through the applications.

Wednesday, 20 June 2012

Hydrant drinking fountain


First trial of the "strangers" fountain today in front of the water center. The fabrication team did a grand job and it's looking very nice.
The fabrication for the 2 other fountains is now starting, looking forward to see the developments.


Friday, 8 June 2012

watershed+ developments


Finally some updates.
The organisation and the setting up of the first Watershed+ initiatives is keeping us busy. From the initial 10 "deliverables", we now have about 25, which is very exciting but takes time.


The bowls for the fountains have arrived today.

The first of these initiatives to become live is the temporary fountains. We've been working with the UEP Public Art Program and the City's metal fabrication team to develop some fountains that can be fixed onto fire hydrants for festivals and other events. Temporary fountains attached to fire hydrant are a fairly common practice in North America, but often limited to a very functional set up and/or as a bilboard for messaging. For Watershed+ the fountains design became an opportunity to play with their social role as gathering spaces and expressing the invisble systems underground. We've designed 3 different fountains which should be ready for Canada day, 1st July. More soon and we'll post pictures as they get built.

We're also having a blog/documentation/source site being developed for W+ which should be ready before the end of the month. In the mean time you can have a look at our daily picture on watershedplus.tumblr.